Delivery delay

Production & Processing Times

At Mycosphere, we care about quality. We work with living products (myceliums) that have a limited lifespan. Therefore, we produce most of our myceliums on demand, so we can send them at the peak of their vigor.

Here are our average production times:

Mycelia on Grains 10-20 days

Mycelia on Ankles 5-15 days

Kits & Packs 3-15 days

Liquid Mycelia 3-7 days

Substrates (Grains, Pellets, etc.) 3-7 days

Grow Bags 3-7 days

Laboratory equipment 3-7 days

Cultivation Equipment 3-7 days

Superfoods 3-7 days

After the production or order processing time, the transport usually takes an average of 2 to 5 business days.

We do not split orders into multiple packages, unless the weight exceeds the 30 kg allowed by the carriers. If you wish to send the order in multiple packages, additional shipping fees will need to be added.

Do you need mycelium on a specific date?

Place your order with the necessary lead time and indicate the desired delivery date in the comments when ordering or by email.

Note : These durations are indicative; they can sometimes be longer depending on the volume of the order placed and the number of orders currently in progress.

Some varieties of mycelium are slower to colonize the grain spawn (blewit, stropharia), so sometimes a little more time is needed.

We prioritize quality over speed. We take our myceliums out of our incubation rooms when they are ready and send them directly. Unlike others, we avoid refrigeration storage as much as possible, which prevents quality loss due to storage duration and temperature variations that this causes.